Thorp Air Command - T18.net

Supporting Owners, Builders and Pilots of the Thorp T-18 and its variants.
It is currently Thu Mar 28, 2024 12:14 pm

All times are UTC - 6 hours [ DST ]




Post new topic Reply to topic  [ 16 posts ]  Go to page 1, 2  Next
Author Message
1albee
 Post subject: Removable Belly Access
PostPosted: Sun May 21, 2017 8:12 am 
Sr. Member
Sr. Member

Joined: Sat Oct 31, 2015 6:58 pm
Posts: 172
Images: 0
Just finished installing a new ADS-B Transponder, new master cylinders and a alternate static port. My plane has a removable belly access panel that is about 18" X 34" aft of the rudder pedals to the box structure for the flight controls. Without this access panel this job would have been a real pain. I am 6' and about 200 LBS and me fitting into this area without this access would have required additional bad language and spilled blood. I was able to sit on the hanger floor and work through this access to get the work done. I recommend that if you are in the construction phase you consider adding this wonderful feature to your project.

Phil Albee
118BC


Top
 Profile Personal album  
 
Rich Brazell
PostPosted: Tue May 23, 2017 5:08 pm 
Hero Member
Hero Member

Joined: Wed Oct 21, 2009 12:33 pm
Posts: 3095
Images: 64
Location: Jamul, CA (San Diego area)
Sometimes in life you are dealt a great hand ! ;) This is one of those times ! :P BING , BANG , BOOM !

RB O0


Top
 Profile Personal album  
 
James Grahn
PostPosted: Tue May 23, 2017 8:18 pm 
Hero Member
Hero Member

Joined: Sat Oct 24, 2009 7:16 pm
Posts: 1434
Images: 0
Location: USA
I wish I had one. I'm still digging to get to my tank. Last obstacle is a lateral angle between WL 42 longerons. It seems to be a grounding bar.
Cubes


Top
 Profile Personal album  
 
Ryan Allen
PostPosted: Tue May 23, 2017 8:23 pm 
Hero Member
Hero Member
User avatar

Joined: Wed Oct 21, 2009 6:10 pm
Posts: 1105
Images: 0
Location: Louisiana
me too. it would be a huge plus to have that access.


Top
 Profile Personal album  
 
1albee
PostPosted: Wed May 24, 2017 4:03 am 
Sr. Member
Sr. Member

Joined: Sat Oct 31, 2015 6:58 pm
Posts: 172
Images: 0
I believe mine was installed some time after the plane was built.
Phil


Top
 Profile Personal album  
 
fytrplt
PostPosted: Wed May 24, 2017 11:02 am 
Hero Member
Hero Member
User avatar

Joined: Tue Oct 20, 2009 8:07 pm
Posts: 1140
Images: 2
Location: Lakeland, Florida, USA
Drill out all of the rivets holding the .040 cockpit floor on and replace them with #8 flathead screws and nutplates. I've done that on three airplanes so far. A two day job max, with the proper tools and supplies. Make sure you use solid nutplates, not "sliders."

_________________
Bob Highley
N711SH
SN 835
KLAL


Top
 Profile Personal album  
 
1albee
PostPosted: Wed May 24, 2017 9:52 pm 
Sr. Member
Sr. Member

Joined: Sat Oct 31, 2015 6:58 pm
Posts: 172
Images: 0
I would say that having the removable belly has saved me more than two days while working on the plane in the one year + I have owned the aircraft. I don't know if I have the patients (and unskinned body parts) to have made the hundreds of trips in and out of the cockpit each time I needed a tool or part.

Phil


Top
 Profile Personal album  
 
pacer18a
PostPosted: Wed Jul 20, 2022 9:18 am 
Newbie
Newbie

Joined: Sun Dec 13, 2009 6:44 pm
Posts: 43
Location: USA
As I am putting N444DD back together I am thinking about doing a removable floor modification. Not sure I am up for that much more additional work but it is probably worth it in the long run. Sounds like the method of drilling out all the floor rivets and replacing with 6-32 or 8-32 nut plates is a popular method. That method seems to leave all the floor support angles in place, how have you found working around those angles in gaining access to what you want to work on? The Roy Farris method outlined in NL 142 looks like it would give better access (and might require a little more work), is there any structural concern in using Roy's method? I would appreciate hearing about your experiences, thoughts or opinions on the subject. Thank you in advance.

Dave


Top
 Profile  
 
fytrplt
PostPosted: Wed Jul 20, 2022 7:31 pm 
Hero Member
Hero Member
User avatar

Joined: Tue Oct 20, 2009 8:07 pm
Posts: 1140
Images: 2
Location: Lakeland, Florida, USA
On mine, the floor angles are removable, too.

_________________
Bob Highley
N711SH
SN 835
KLAL


Top
 Profile Personal album  
 
pacer18a
PostPosted: Wed Jul 20, 2022 10:24 pm 
Newbie
Newbie

Joined: Sun Dec 13, 2009 6:44 pm
Posts: 43
Location: USA
Bob do your rudder pedals and brakes stay in place when you remove the floor stringer angles? Any chance you have any pictures or sketches of your method? Just trying to picture how you have done yours. Do you have any opinion on the structural integrity of the NL 142 method?

Thanks

Dae


Top
 Profile  
 
david read
PostPosted: Thu Jul 21, 2022 8:51 pm 
Sr. Member
Sr. Member

Joined: Tue Oct 20, 2009 9:21 pm
Posts: 225
Location: USA
If you come to OSH you can look at Gary Green’s method. I did mine the same way. The whole floor behind the rudder pedals comes out. I really like the accessibility


Top
 Profile  
 
fytrplt
PostPosted: Sat Jul 23, 2022 5:09 am 
Hero Member
Hero Member
User avatar

Joined: Tue Oct 20, 2009 8:07 pm
Posts: 1140
Images: 2
Location: Lakeland, Florida, USA
Dae, My floor was patterned after Ken Brock's set up. On my flying plane, the pedal stringers come loose when the screws are removed. It is best to undo the rudder cables at the rudder before taking the floor screws out. As far as strength is concerned, the screws have better shear strength than visits as long as you do not use floating nutplates.. On my project, Scrappy, I built it so the stringers stay in place when the screws are removed.

_________________
Bob Highley
N711SH
SN 835
KLAL


Top
 Profile Personal album  
 
pacer18a
PostPosted: Sat Jul 23, 2022 7:30 pm 
Newbie
Newbie

Joined: Sun Dec 13, 2009 6:44 pm
Posts: 43
Location: USA
Dave thanks for the post, I will not be at OSH but am interested in what Gary Green's method is but could not find any pictures that I could get to open up tp look at. I might just have to stop by Olney or maybe see you at Shumway in August.

Bob thanks for the info on strength, are there any info/pictures of the Ken Brock method available?

Thanks again guys.

Dave


Top
 Profile  
 
pacer18a
PostPosted: Tue Aug 02, 2022 9:44 am 
Newbie
Newbie

Joined: Sun Dec 13, 2009 6:44 pm
Posts: 43
Location: USA
Just checking back in to see if anyone knows where I could find online any info and pictures of the Gary Green and the Ken Brock removable floor methods?

I am leaning towards using a modified Roy Farris method since the floor is currently in place but open to some ideas, I am getting close to pulling the trigger.

Thanks

Dave
N444DD


Top
 Profile  
 
mrtex
PostPosted: Wed Aug 03, 2022 3:05 pm 
Newbie
Newbie

Joined: Mon May 24, 2021 2:07 pm
Posts: 1
Dave,

I am a newbie and I hope these photos contribute to your efforts. These were taken for my photo log the morning I put the floor back in. Let me know if you need a pic from a particular angle and I'll see if I have it. Note: this center section design must be installed from the top after the floor assembly is attached from the bottom and the rudder cables are re-attached.

Matt

Image

Image


Top
 Profile  
 
Display posts from previous:  Sort by  
Post new topic Reply to topic  [ 16 posts ]  Go to page 1, 2  Next

All times are UTC - 6 hours [ DST ]


Who is online

Users browsing this forum: No registered users and 4 guests


You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot post attachments in this forum

Search for:
Jump to:  
cron

[ Time : 0.188s | 12 Queries | GZIP : On ]